• NCU
  • 中文
  • English
  • 中文 中文 中文 zh-hant
  • English English English en
國立中央大學土木工程學系
  • Department Info
    • Our Vision
    • History
    • Overview
  • Latest News
  • Division
    • Geotechnical Eng.
    • Geoinformatics Eng.
    • Materials Eng.
    • Mechanics and Structural Eng.
    • Transportation Eng.
    • Information Technology
    • Water Resource Eng.
  • Faculty
    • ALL
    • Structural and Geotechnical Eng.
    • Environment and Resources
    • Transportation and Engineering Management
    • Informatics and Advanced Technology
    • Hazard Mitigation and Sustainable Development
  • Research
    • Research Area
    • Curricula
    • Laboratories
      • Structural Engineering Laboratory
      • Geotechnical Engineering Laboratory
      • Wind tunnel & Hydraulics Laboratory
  • More
    • Future
  • Search
  • Menu

Transportation and Engineering Management

Faculty

Construction Engineering and Management

Yang, Jyh-Bin

  • Professor
  • TEL:886-3- 422-7151 #34040
  • FAX:886-3- 425-2960
  • E-mail: jyhbin@ncu.edu.tw

Research Interests

Construction Management & Project Management
Project Scheduling & Delay Analysis
Procurement Performance Evaluation & Performance-Based Contract
Knowledge Management System Development
Applications of BIM & IT in Construction Management

Courses

BIM and Computer Application
Thesis Writing and Issuing
Project Procurement Management
Introduction to Civil Engineering
Construction Management
Research Methodology for Construction
Project Schedule Management

Academic Journal Articles

  1. Jyh-Bin Yang and Sheng-Chi Peng,Development of a customer satisfaction evaluation model for construction project management,Building and Environment
  2. Jyh-Bin Yang,Developing a knowledge map for construction scheduling using a novel approach,Automation in Construction
  3. Jyh-Bin Yang, Chih-Tes Wu and Chiang-Huai Tsai,Selection of an ERP System for a construction firm in Taiwan: a case study,Automation in Construction
  4. Chun-Chang Lin, Wei-Chih Wang and Jyh-Bin Yang,Evaluating bid item prices to support contractor selection – a case study,Journal of the Chinese Institute of Engineers
  5. Ming-Kuan Tsai, Jyh-Bin Yang and Chang-Yu Lin,Synchronization-based model for improving on-site data collection performance,Automation in Construction, 16, No. 3,pp. 323-335,2007
  6. Ming-Kuan Tsai, Jyh-Bin Yang and Chang-Yu Lin,Integrating wireless and speech technologies for synchronous on-site data collection,Automation in Construction, 16, No. 3,pp. 378-391,2007
  7. Jyh-Bin Yang,How the critical chain scheduling method working for construction,Cost Engineering, 40, No. 4,pp. 25-32,2007
  8. Wei-Chih Wang and Jyh-Bin Yang,Applications of electronically facilitated bidding model to preventing construction disputes,Automation in Construction, 14, No. 5,pp. 599-610,2005
  9. Jyh-Bin Yang and Wei-Chih Wang,Contractor selection by the most advantageous tendering approach in Taiwan,Journal of the Chinese Institute of Engineers, 26, No.3,pp. 381-387,2003
  10. Jyh-Bin Yang,rule induction-based knowledge system for retaining wall selection,Expert Systems with Applications, 23, Iss.3,pp. 273-279,2002
  11. Jyh-Bin Yang and Nie-Jia Yau,ntegrating case-based reasoning and expert system techniques for solving experience-oriented problems,Journal of the Chinese Institute of Engineers, 23, No.1,pp. 83-95,2000
  12. Nie-Jia Yau, Jyh-Bin Yang, and Ting-Ya Hsieh,Inducing rules for selecting retaining wall systems,Construction Management and Economics, 17, No. 1,pp. 91-98,1999
  13. Nie-Jia Yau and Jyh-Bin Yang,Applying CBR Technique to Retaining Wall Selection,Automation in Construction, 7, No. 4,pp. 271-283,1998
  14. Nie-Jia Yau and Jyh-Bin Yang,Case-Based Reasoning in Construction Management,Microcomputers in Civil Engineering: Journal of Co, 13, Iss. 2,pp. 143-150,1998
  15. 楊智斌,專案管?實務案?:咖啡專賣?鎖店?銷專案),台灣專案管?雜誌,創刊號,40-46,2007
  16. 楊智斌、尹碧娟,國外工程時程延遲分析技術之比較(下),營建知訊,第283 期,49-59,2006
  17. 楊智斌、黃榮堯,國內營建管?教育對國際專案管?證照發展因應之道,土木水?,第33 卷第4 期,40-49,2006
  18. 楊智斌、鄧雅?,營建管?碩士?文引用文獻分析,營建管?季刊,第67 期,41-51,2006
  19. 楊智斌、尹碧娟,國外工程時程延遲分析技術之比較,營建知訊,第281 期,59-64,2006
  20. 楊智斌、魏沛銳,工程規劃設計階段時程延遲原因調查分析,中華建築技術學刊,第二卷第二期,53-60,2005
  21. 楊智斌、黃賢炳,專案管?廠商服務成本調查分析,營建管?季刊,第65 期,1-5,2005
  22. 余文德、楊智斌,公?工程工期與成本關係之探討,中國土木水?工程學刊,第17 卷第3 期,559-566,2005
  23. 楊智斌、歐昇芬,工程施工階段時程延遲原因調查分析,中華建築技術學刊,第二卷第一期,45-54,2005
  24. 楊智斌、吳坤鴻,時程分析技術知?地圖之建置,營建管?季刊,第63 期,29-38,2005
  25. 余文德、楊智斌、賴建中、鄭正光,??經模糊系統於工程成本概估及分析之應用—以鋼筋混凝土公?橋?為?,土木水?,第31 卷第1期,74-77,2004
  26. 姚乃嘉、楊智斌、郭文達,投標決策因素之分析與應用,建築學報,第36 期,21-37,2001
  27. 楊智斌、姚乃嘉,法則歸納法應用自動化之整合型模式,中國土木水?工程學刊,第12 卷第1 期,179-186,2000
  28. 姚乃嘉、楊智斌、郭文達,營造公司工程現???之預測模式,中國土木水?工程學刊,第10 卷第3 期,397-405,1998
  29. Jyh-Bin Yang, Han-Hsiang Wang, Wei-Chih Wang Ma,Using Data Envelopment Analysis to Support Best-value Contractor Selection,Journal of Civil Engineering and Management,2015
  30. 王世旭、周慧瑜、王維志、楊智斌、曾惠斌,新加坡公共工程施工標採購制度之分析,營建管理季刊,第102期,第1-15頁,2015
  31. 楊智斌、蔡碩棋,政府採購法下重大採購效益評估制度之問題分析,營建管理季刊,第101期,第10-23頁,2015
  32. 楊智斌,專案管理知識發展與應用—專輯序言,工程,第88卷第3期,第38-41頁,2015
  33. 楊智斌,專案管理知識之國際發展趨勢分析,工程,第88卷第3期,第42-52頁,2015
  34. 楊智斌,國內勞務服務採購採用成效式契約之分析,營建管理季刊,第100期,第1-13頁,2015
  35. Jyh-Bin Yang and Chien-Chung Chen,Causes of Budget Changes in Building Construction Projects: An Empirical Study in Taiwan,Engineering Economist, 60, No. 1,pp. 1-21,2015
  36. 楊智斌、姚乃嘉,國內時程管理教育現況分析與改善建議,營建管理季刊,第98期,第42-49頁,2014
  37. Jyh-Bin Yang, Wen-Der Yu, Judy C. R. Tseng, Chia-S,Benefit Analysis of Knowledge Management System for Engineering Consulting Firms,Journal of Management in Engineering, ASCE, 30, No. 4, pp. 05014005-1-8,2014
  38. Jyh-Bin Yang*, Kuei-Mei Huang, Chang-Hung Lee and,Incorporating Lost Productivity Calculation into Delay Analysis for Construction Projects,KSCE Journal of Civil Engineering, 18, No. 2,pp. 380-388,2014
  39. 王明德、邱垂德、余文德、楊智斌,國內BIM 產業與大學教育現況分析,營建管理季刊,第96期,第42-49頁,2013
  40. Ming-Kuan Tsai, Jyh-Bin Yang and Nie-Jia Yau,Developing Computer-based Schedule Delay Analysis Methods Based on Information Flow Analysis: A Case Study,Journal of Civil Engineering and Management, 19, No. 6,pp. 823-835,2013
  41. Jyh-Bin Yang*, Mei-Yi Chu, and Kuei-Mei Huang,An Empirical Study of Schedule Delay Causes Based on Taiwan’s Litigation Cases,Project Management Journal, 44, No. 3,pp. 21-31,2013
  42. 彭凱烽、楊智斌,成效式契約應用於公有建築物能源設備維護管理之案例分析,營建管理季刊,第94期,第37-55頁,2013
  43. Ji-Wei Wu, Judy C. R. Tseng, Wen-Der Yu, Jyh-Bin Y,An integrated Proactive knowledge management model for enhancing engineering services,Automation in Construction, 24,pp. 81-88,2012
  44. Nie-Jia Yau and Jyh-Bin Yang,Factors Causing Design Schedule Delays in Turnkey Projects in Taiwan: An Empirical Study of Power Distribution Substation Projects,Project Management Journal, 43, No. 3,pp. 50-61,2012
  45. Jyh-Bin Yang and Chih-Kuei Kao,Critical Path Effect Based Delay Analysis Method for Construction Projects,International Journal of Project Management, 30, No. 3,pp. 385-397,2012
  46. 徐朝聲、楊智斌、鄭紹材,現有專案管理服務計費方式之問題與解決方式,營建管理季刊,第87期,第14-27頁,2011
  47. Jyh-Bin Yang and Ming-Kuan Tsai,Computerizing ICBF method for schedule delay analysis,Journal of Construction Engineering and Management, 137, No. 8,pp. 583-591,2011
  48. Wen-Der Yu*, Jyh-Bin Yang, Judy C. R. Tseng, Shen-,Proactive Problem-solver for Construction,Automation in Construction, 19, No. 6,pp. 808-816,2010
  49. Jyh-Bin Yang, Chi-Cheng Yang and Chih-Kuei Kao,Evaluating Schedule Delay Causes for Private Participating Public Construction Works Under the Build-Operate-Transfer Model,International Journal of Project Management, 28, No. 6,pp. 569-579,2010
  50. 邱垂德、楊智斌、王明德、徐景文,導入成效式契約以提昇鋪面養護效率,土木水利,第37卷第4期,第10-17頁,2010
  51. Jyh-Bin Yang and Pei-Rei Wei,Causes of delay in the planning and design phases for construction projects,Journal of Architectural Engineering, 16, No. 2,pp. 80-83,2010
  52. 楊智斌、葉靜瑤,營建管理季刊文章回顧分析:1989~2009,營建管理季刊,第83期,第36-45頁,2010
  53. 陳桂蘭、楊智斌,統包工程爭議案例與業主因應措施之分析,營造天下,第148期,第31-40頁,2010
  54. 姚宣合、余文德、楊智斌、曾秋蓉、劉沈榮、張佩倫,營建知識社群知識加值績效量化評估模式之研究,中國土木水利工程學刊,第22卷第1期,第127-139頁,2010
  55. 余文德、楊智斌、鄭紹材,從88水災談重建工程之專案管理思維,台灣專案管理雜誌,第5期,第54-55頁,2009
  56. 邱垂德、楊智斌、翁紹偉、呂理成,成效指標於國內道路之實證初探,鋪面工程,第7卷第4期,第31-40頁,2009
  57. 楊智斌、余文德、邱垂德、鄭紹材,國內道路養護導入成效式合約分析,營建管理季刊,第80期,第38-46頁,2009
  58. Jyh-Bin Yang and Chih-Kuei Kao,Review of delay analysis methods: a process-based comparison,The Open Construction and Building Technology Jour, 3,pp. 81-89,2009
  59. Jyh-Bin Yang and Pi-Chung Yin,Isolated collapsed but-for delay analysis methodology,Journal of Construction Engineering and Management, 135, No.7,pp. 570-578,2009
  60. 鄭秀玲、楊智斌,營建專案採購管理人員專案管理知識之分析,營建管理季刊,第79期,第11-21頁,2009
  61. Chih-Kuei Kao and Jyh-Bin Yang,Comparison of windows-based delay analysis methods,International Journal of Project Management, 27, No. 4,pp. 408-418,2009
  62. 楊文賓、楊智斌,汙水下水道工程延遲原因特殊性分析,營建管理季刊,第77期,第48-57頁,2008
  63. 黃桂梅、楊智斌,專案契約文件管理常態與錯誤態樣分析,營建管理季刊,第76期,第42-46頁,2008
  64. 楊智斌*、余文德、曾秋蓉、黃祥宇、劉沈榮、吳誠魁、陳冠霖、張佩倫,工程顧問業知識文件知識地圖之建立,營建管理季刊,第75期,第59-68頁,2008
  65. 楊智斌、余文德、邱垂德、鄭紹材,專案管理創新思維:成效式合約介紹,台灣專案管理雜誌,第三期,第55-57頁,2008
  66. 楊智斌、呂文授,營建專案管理經理人應具備基本知識之分析,專案管理學刊,第1卷第1期,第1-19頁,2008
  67. Jyh-Bin Yang and Shen-Fen Ou,Using structural equation modeling to analyze relationships among key causes of delay in construction,Canadian Journal of Civil Engineering, 35, No. 4,pp. 321-332,2008
  68. Jyh-Bin Yang and Sheng-Chi Peng,Development of a customer satisfaction evaluation model for construction project management,Building and Environment, 43, No. 4,pp. 458-468,2008
  69. 呂文授、楊智斌,營建專案管理經理人應具備人格特質之分析,營建管理季刊,第74期,第35-43頁,2008
  70. 廖碧雲、楊智斌,汙水下水道管線工程成本結構分析,營建管理季刊,第73期,第68-77頁,2007
  71. Jyh-Bin Yang,Developing a knowledge map for construction scheduling using a novel approach,Automation in Construction, 16, No. 6,pp. 806-815,2007
  72. Jyh-Bin Yang, Chih-Tes Wu and Chiang-Huai Tsai,Selection of an ERP System for a construction firm in Taiwan: a case study,Automation in Construction, 16, No. 6,pp. 787-796,2007
  73. Chun-Chang Lin, Wei-Chih Wang* and Jyh-Bin Yang,Evaluating bid item prices to support contractor selection – a case study,Journal of the Chinese Institute of Engineers, 30, No.4,pp. 765-771,2007
  74. Ming-Kuan Tsai, Jyh-Bin Yang and Chang-Yu Lin,Synchronization-based model for improving on-site data collection performance,Automation in Construction, 16, No. 3,pp. 323-335,2007
  75. Ming-Kuan Tsai, Jyh-Bin Yang and Chang-Yu Lin,Integrating wireless and speech technologies for synchronous on-site data collection,Automation in Construction, 16, No. 3,pp. 378-391,2007
  76. Jyh-Bin Yang,How the critical chain scheduling method working for construction,Cost Engineering, 40, No. 4,pp. 25-32,2007
  77. 楊智斌,專案管理實務案例:咖啡專賣連鎖店行銷專案,台灣專案管理雜誌,創刊號,第40-46頁,2007
  78. 楊智斌、尹碧娟,國外工程時程延遲分析技術之比較(下),營建知訊,第283期,第49-59頁,2006
  79. 楊智斌、黃榮堯,國內營建管理教育對國際專案管理證照發展因應之道,土木水利,第33卷第4期,第40-49頁,2006
  80. 楊智斌、鄧雅玲,營建管理碩士論文引用文獻分析,營建管理季刊,第67期,第41-51頁,2006
  81. 楊智斌、尹碧娟,國外工程時程延遲分析技術之比較(上),營建知訊,第281期,第59-64頁,2006
  82. 楊智斌、魏沛銳,工程規劃設計階段時程延遲原因調查分析,中華建築技術學刊,第2卷第2期,第53-60頁,2005
  83. 楊智斌、黃賢炳,專案管理廠商服務成本調查分析,營建管理季刊,第65期,第1-5頁,2005
  84. Wei-Chih Wang and Jyh-Bin Yang,Applications of electronically facilitated bidding model to preventing construction disputes,Automation in Construction, 14, No. 5, pp. 599-610,2005
  85. 楊智斌、葉坤源,案例式專案管理廠商資格條件知識庫系統之建立,技術學刊,第20卷第3期,第231-240頁,2005
  86. 余文德、楊智斌,公路工程工期與成本關係之探討,中國土木水利工程學刊,第17卷第3期,第559-566頁,2005
  87. 楊智斌、歐昇芬,工程施工階段時程延遲原因調查分析,中華建築技術學刊,第2卷第1期,第45-54頁,2005
  88. 楊智斌、吳坤鴻,時程分析技術知識地圖之建置,營建管理季刊,第63期,第29-38頁,2005
  89. 尹碧娟、楊智斌,營建業赴中國公司內部生產管理機制探討,現代營建,第301期,第51-56頁,2005
  90. 楊智斌、高志魁,關鍵鏈排程與資源限制排程之差異分析,中華建築技術學刊,第1卷第1期,第67-76頁,2004
  91. 余文德、楊智斌,鋼筋混凝土公路橋梁工程成本概估系統,亞太工程科技學報,第2卷第2期,第85-102頁,2004
  92. 陳曄、楊智斌,國內承包商簽訂國際性工程契約應注意事項分析,營建管理季刊,第59期,第51-54頁,2004
  93. 卓利彥、楊智斌,國內建築模版工程採用新工法之問題分析,現代營建,第293期,第31-35頁,2004
  94. 陳曄、楊智斌,建築設施維護管理模式與資訊化之探討,營建知訊,第255期,第35-45頁,2004
  95. 楊智斌、高志魁,關鍵鏈排程法原理與應用,營建管理季刊,第58期,第46-53頁,2004
  96. Jyh-Bin Yang,A hybrid AI system for retaining wall selection problems,Construction Innovation, 4, No. 1,pp. 33-52,2004
  97. 余文德、楊智斌、賴建中、鄭正光,類神經模糊系統於工程成本概估及分析之應用—以鋼筋混凝土公路橋梁為例,土木水利,第31卷第1期,第74-77頁,2004
  98. 楊智斌、林鴻倫、陳瑩潔、彭聖麒、王慕舜,營建工程專案管理業主滿意度分析,現代營建,第290期,第63-69頁,2004
  99. 楊智斌、曾錦燦,大陸政府採購法位階屬行政法,營建知訊,第251期,第20-28頁,2003
  100. 吳秩策、蔡江淮、楊智斌,營造業電子化的關鍵因素,營造天下,第95-96期,第21-25頁,2003
  101. 余文德、楊智斌,e化課程對於營建工程教育之效益分析,技術學刊,第18卷,第4期,第451-459頁,2003
  102. Jyh-Bin Yang and Wei-Chih Wang,Contractor selection by the most advantageous tendering approach in Taiwan,Journal of the Chinese Institute of Engineers, 26, No. 3,pp. 381-387,2003
  103. 楊智斌、陳威銘,運用共同排程資訊即時化,營建知訊,第244期,第41-49頁,2003
  104. 楊智斌、陳威銘,傳統排程與共同排程之比較分析,土木工程技術,第7卷第1期,第33-46頁,2003
  105. 楊智斌,案例式推理技術在營建產業應用之探討,現代營建,第277期,第45-54頁,2003
  106. 楊智斌、李雨澤,高科技廠商建廠過程業主端之時程控管現況分析,現代營建,第276期,第51-57頁,2002
  107. 楊智斌、林涵文、彭皓銑,國內甲級營造廠使用營建管理軟體之現況調查,現代營建,第275期,第75-81頁,2002
  108. Jyh-Bin Yang,A rule induction-based knowledge system for retaining wall selection,Expert Systems with Applications, 23, No. 3,pp. 273-279,2002
  109. 楊智斌、陳威銘、葉坤源,營建工程專案排程軟體功能分析與比較,營建管理季刊,第51期,第23-32頁,2002
  110. 姚乃嘉、楊智斌、郭文達,投標決策因素之分析與應用,建築學報,第36期,第21-37頁,2001
  111. 楊智斌、姚乃嘉,法則歸納法應用自動化之整合型模式,中國土木水利工程學刊,第12卷第1期,第179-186頁,2000
  112. Jyh-Bin Yang and Nie-Jia Yau,Integrating case-based reasoning and expert system techniques for solving experience-oriented problems,Journal of the Chinese Institute of Engineers,, 23, No. 1,pp. 83-95,2000
  113. Nie-Jia Yau, Jyh-Bin Yang, and Ting-Ya Hsieh,Inducing rules for selecting retaining wall systems,Construction Management and Economics, 17, No. 1,pp. 91-98,1999
  114. 楊智斌、姚乃嘉,公部門採行專業營建管理制度實施重點之探討,營建管理季刊,第37期,第23-32頁,1998
  115. 姚乃嘉、楊智斌、郭文達,營造公司工程現金流量之預測模式,中國土木水利工程學刊,第10卷第3期,第397-405頁,1998
  116. 姚乃嘉、楊智斌、郭文達,營造公司工程現金流量之預測模式,中國土木水利工程學刊,第10卷第3期,第397-405頁,1998
  117. Nie-Jia Yau and Jyh-Bin Yang,Applying CBR Technique to Retaining Wall Selection,Automation in Construction, 7, No. 4,pp. 271-283,1998
  118. Nie-Jia Yau and Jyh-Bin Yang,Case-Based Reasoning in Construction Management,Microcomputers in Civil Engineering: Journal of Co, 13, No. 2, pp. 143-150,1998
  119. 姚乃嘉、楊智斌,工程投標前之成本分析,營建管理季刊,第23期,第46-58頁,1995
  120. 姚乃嘉、楊智斌,專家系統在營建管理上之應用,營建管理季刊,第21期,第39-48頁,1994

Experience

Professor, Graduate Institute Program of Construction Engineering & Management, Department of Civil Engineering, National Central University, Taiwan

Associate Director, Planning Office of Intelligent Health Innovation Park on NCU Bade Campus

Education

National Central University, Ph.D., 1997

National Central University, Bachelor, 1993

Department of Civil Engineering at NCU

Add:No.300, Chung-da Rd. Chung-Li city, Tao-Yuan 32011,Taiwan, Republic of China

Contact Us

Tel:8863-422-7151 #34070
Fax:8863-425-2960
Mail:ncu4100@cc.ncu.edu.tw

© 2020 Copyright - 2020 Department of Civil Engineering at NCU. All Rights Reserved
Yau, Nie-Jia Yan, Shang-Yao Scroll to top