Construction Engineering and Management
Research Interests
Construction Management & Project Management
Project Scheduling & Delay Analysis
BIM Implementation Policies, Contract and Application Benefits Evaluation
Procurement Performance Evaluation & Performance-Based Contract
PPP Project Evaluation & Benefits Appraisal
Courses
BIM and Computer Application
Thesis Writing and Issuing
Project Procurement Management
Introduction to Civil Engineering
Construction Management
Research Methodology for Construction
Project Schedule Management
Yang, Jyh-Bin
- Professor
- TEL:886-3- 422-7151 #34040
- FAX:886-3- 425-2960
- E-mail: jyhbin@ncu.edu.tw
Education
National Central University, Ph.D., 1997
National Central University, Bachelor, 1993
Experience
Professor, Graduate Institute Program of Construction Engineering & Management, Department of Civil Engineering, National Central University, Taiwan
Associate Director, Planning Office of Intelligent Health Innovation Park on NCU Bade Campus
Academic Journal Articles
- Jyh-Bin Yang and Sheng-Chi Peng,Development of a customer satisfaction evaluation model for construction project management,Building and Environment
- Jyh-Bin Yang,Developing a knowledge map for construction scheduling using a novel approach,Automation in Construction
- Jyh-Bin Yang, Chih-Tes Wu and Chiang-Huai Tsai,Selection of an ERP System for a construction firm in Taiwan: a case study,Automation in Construction
- Chun-Chang Lin, Wei-Chih Wang and Jyh-Bin Yang,Evaluating bid item prices to support contractor selection – a case study,Journal of the Chinese Institute of Engineers
- Ming-Kuan Tsai, Jyh-Bin Yang and Chang-Yu Lin,Synchronization-based model for improving on-site data collection performance,Automation in Construction, 16, No. 3,pp. 323-335,2007
- Ming-Kuan Tsai, Jyh-Bin Yang and Chang-Yu Lin,Integrating wireless and speech technologies for synchronous on-site data collection,Automation in Construction, 16, No. 3,pp. 378-391,2007
- Jyh-Bin Yang,How the critical chain scheduling method working for construction,Cost Engineering, 40, No. 4,pp. 25-32,2007
- Wei-Chih Wang and Jyh-Bin Yang,Applications of electronically facilitated bidding model to preventing construction disputes,Automation in Construction, 14, No. 5,pp. 599-610,2005
- Jyh-Bin Yang and Wei-Chih Wang,Contractor selection by the most advantageous tendering approach in Taiwan,Journal of the Chinese Institute of Engineers, 26, No.3,pp. 381-387,2003
- Jyh-Bin Yang,rule induction-based knowledge system for retaining wall selection,Expert Systems with Applications, 23, Iss.3,pp. 273-279,2002
- Jyh-Bin Yang and Nie-Jia Yau,ntegrating case-based reasoning and expert system techniques for solving experience-oriented problems,Journal of the Chinese Institute of Engineers, 23, No.1,pp. 83-95,2000
- Nie-Jia Yau, Jyh-Bin Yang, and Ting-Ya Hsieh,Inducing rules for selecting retaining wall systems,Construction Management and Economics, 17, No. 1,pp. 91-98,1999
- Nie-Jia Yau and Jyh-Bin Yang,Applying CBR Technique to Retaining Wall Selection,Automation in Construction, 7, No. 4,pp. 271-283,1998
- Nie-Jia Yau and Jyh-Bin Yang,Case-Based Reasoning in Construction Management,Microcomputers in Civil Engineering: Journal of Co, 13, Iss. 2,pp. 143-150,1998
- 楊智斌,專案管?實務案?:咖啡專賣?鎖店?銷專案),台灣專案管?雜誌,創刊號,40-46,2007
- 楊智斌、尹碧娟,國外工程時程延遲分析技術之比較(下),營建知訊,第283 期,49-59,2006
- 楊智斌、黃榮堯,國內營建管?教育對國際專案管?證照發展因應之道,土木水?,第33 卷第4 期,40-49,2006
- 楊智斌、鄧雅?,營建管?碩士?文引用文獻分析,營建管?季刊,第67 期,41-51,2006
- 楊智斌、尹碧娟,國外工程時程延遲分析技術之比較,營建知訊,第281 期,59-64,2006
- 楊智斌、魏沛銳,工程規劃設計階段時程延遲原因調查分析,中華建築技術學刊,第二卷第二期,53-60,2005
- 楊智斌、黃賢炳,專案管?廠商服務成本調查分析,營建管?季刊,第65 期,1-5,2005
- 余文德、楊智斌,公?工程工期與成本關係之探討,中國土木水?工程學刊,第17 卷第3 期,559-566,2005
- 楊智斌、歐昇芬,工程施工階段時程延遲原因調查分析,中華建築技術學刊,第二卷第一期,45-54,2005
- 楊智斌、吳坤鴻,時程分析技術知?地圖之建置,營建管?季刊,第63 期,29-38,2005
- 余文德、楊智斌、賴建中、鄭正光,??經模糊系統於工程成本概估及分析之應用—以鋼筋混凝土公?橋?為?,土木水?,第31 卷第1期,74-77,2004
- 姚乃嘉、楊智斌、郭文達,投標決策因素之分析與應用,建築學報,第36 期,21-37,2001
- 楊智斌、姚乃嘉,法則歸納法應用自動化之整合型模式,中國土木水?工程學刊,第12 卷第1 期,179-186,2000
- 姚乃嘉、楊智斌、郭文達,營造公司工程現???之預測模式,中國土木水?工程學刊,第10 卷第3 期,397-405,1998
- Jyh-Bin Yang, Han-Hsiang Wang, Wei-Chih Wang Ma,Using Data Envelopment Analysis to Support Best-value Contractor Selection,Journal of Civil Engineering and Management,2015
- 王世旭、周慧瑜、王維志、楊智斌、曾惠斌,新加坡公共工程施工標採購制度之分析,營建管理季刊,第102期,第1-15頁,2015
- 楊智斌、蔡碩棋,政府採購法下重大採購效益評估制度之問題分析,營建管理季刊,第101期,第10-23頁,2015
- 楊智斌,專案管理知識發展與應用—專輯序言,工程,第88卷第3期,第38-41頁,2015
- 楊智斌,專案管理知識之國際發展趨勢分析,工程,第88卷第3期,第42-52頁,2015
- 楊智斌,國內勞務服務採購採用成效式契約之分析,營建管理季刊,第100期,第1-13頁,2015
- Jyh-Bin Yang and Chien-Chung Chen,Causes of Budget Changes in Building Construction Projects: An Empirical Study in Taiwan,Engineering Economist, 60, No. 1,pp. 1-21,2015
- 楊智斌、姚乃嘉,國內時程管理教育現況分析與改善建議,營建管理季刊,第98期,第42-49頁,2014
- Jyh-Bin Yang, Wen-Der Yu, Judy C. R. Tseng, Chia-S,Benefit Analysis of Knowledge Management System for Engineering Consulting Firms,Journal of Management in Engineering, ASCE, 30, No. 4, pp. 05014005-1-8,2014
- Jyh-Bin Yang*, Kuei-Mei Huang, Chang-Hung Lee and,Incorporating Lost Productivity Calculation into Delay Analysis for Construction Projects,KSCE Journal of Civil Engineering, 18, No. 2,pp. 380-388,2014
- 王明德、邱垂德、余文德、楊智斌,國內BIM 產業與大學教育現況分析,營建管理季刊,第96期,第42-49頁,2013
- Ming-Kuan Tsai, Jyh-Bin Yang and Nie-Jia Yau,Developing Computer-based Schedule Delay Analysis Methods Based on Information Flow Analysis: A Case Study,Journal of Civil Engineering and Management, 19, No. 6,pp. 823-835,2013
- Jyh-Bin Yang*, Mei-Yi Chu, and Kuei-Mei Huang,An Empirical Study of Schedule Delay Causes Based on Taiwan’s Litigation Cases,Project Management Journal, 44, No. 3,pp. 21-31,2013
- 彭凱烽、楊智斌,成效式契約應用於公有建築物能源設備維護管理之案例分析,營建管理季刊,第94期,第37-55頁,2013
- Ji-Wei Wu, Judy C. R. Tseng, Wen-Der Yu, Jyh-Bin Y,An integrated Proactive knowledge management model for enhancing engineering services,Automation in Construction, 24,pp. 81-88,2012
- Nie-Jia Yau and Jyh-Bin Yang,Factors Causing Design Schedule Delays in Turnkey Projects in Taiwan: An Empirical Study of Power Distribution Substation Projects,Project Management Journal, 43, No. 3,pp. 50-61,2012
- Jyh-Bin Yang and Chih-Kuei Kao,Critical Path Effect Based Delay Analysis Method for Construction Projects,International Journal of Project Management, 30, No. 3,pp. 385-397,2012
- 徐朝聲、楊智斌、鄭紹材,現有專案管理服務計費方式之問題與解決方式,營建管理季刊,第87期,第14-27頁,2011
- Jyh-Bin Yang and Ming-Kuan Tsai,Computerizing ICBF method for schedule delay analysis,Journal of Construction Engineering and Management, 137, No. 8,pp. 583-591,2011
- Wen-Der Yu*, Jyh-Bin Yang, Judy C. R. Tseng, Shen-,Proactive Problem-solver for Construction,Automation in Construction, 19, No. 6,pp. 808-816,2010
- Jyh-Bin Yang, Chi-Cheng Yang and Chih-Kuei Kao,Evaluating Schedule Delay Causes for Private Participating Public Construction Works Under the Build-Operate-Transfer Model,International Journal of Project Management, 28, No. 6,pp. 569-579,2010
- 邱垂德、楊智斌、王明德、徐景文,導入成效式契約以提昇鋪面養護效率,土木水利,第37卷第4期,第10-17頁,2010
- Jyh-Bin Yang and Pei-Rei Wei,Causes of delay in the planning and design phases for construction projects,Journal of Architectural Engineering, 16, No. 2,pp. 80-83,2010
- 楊智斌、葉靜瑤,營建管理季刊文章回顧分析:1989~2009,營建管理季刊,第83期,第36-45頁,2010
- 陳桂蘭、楊智斌,統包工程爭議案例與業主因應措施之分析,營造天下,第148期,第31-40頁,2010
- 姚宣合、余文德、楊智斌、曾秋蓉、劉沈榮、張佩倫,營建知識社群知識加值績效量化評估模式之研究,中國土木水利工程學刊,第22卷第1期,第127-139頁,2010
- 余文德、楊智斌、鄭紹材,從88水災談重建工程之專案管理思維,台灣專案管理雜誌,第5期,第54-55頁,2009
- 邱垂德、楊智斌、翁紹偉、呂理成,成效指標於國內道路之實證初探,鋪面工程,第7卷第4期,第31-40頁,2009
- 楊智斌、余文德、邱垂德、鄭紹材,國內道路養護導入成效式合約分析,營建管理季刊,第80期,第38-46頁,2009
- Jyh-Bin Yang and Chih-Kuei Kao,Review of delay analysis methods: a process-based comparison,The Open Construction and Building Technology Jour, 3,pp. 81-89,2009
- Jyh-Bin Yang and Pi-Chung Yin,Isolated collapsed but-for delay analysis methodology,Journal of Construction Engineering and Management, 135, No.7,pp. 570-578,2009
- 鄭秀玲、楊智斌,營建專案採購管理人員專案管理知識之分析,營建管理季刊,第79期,第11-21頁,2009
- Chih-Kuei Kao and Jyh-Bin Yang,Comparison of windows-based delay analysis methods,International Journal of Project Management, 27, No. 4,pp. 408-418,2009
- 楊文賓、楊智斌,汙水下水道工程延遲原因特殊性分析,營建管理季刊,第77期,第48-57頁,2008
- 黃桂梅、楊智斌,專案契約文件管理常態與錯誤態樣分析,營建管理季刊,第76期,第42-46頁,2008
- 楊智斌*、余文德、曾秋蓉、黃祥宇、劉沈榮、吳誠魁、陳冠霖、張佩倫,工程顧問業知識文件知識地圖之建立,營建管理季刊,第75期,第59-68頁,2008
- 楊智斌、余文德、邱垂德、鄭紹材,專案管理創新思維:成效式合約介紹,台灣專案管理雜誌,第三期,第55-57頁,2008
- 楊智斌、呂文授,營建專案管理經理人應具備基本知識之分析,專案管理學刊,第1卷第1期,第1-19頁,2008
- Jyh-Bin Yang and Shen-Fen Ou,Using structural equation modeling to analyze relationships among key causes of delay in construction,Canadian Journal of Civil Engineering, 35, No. 4,pp. 321-332,2008
- Jyh-Bin Yang and Sheng-Chi Peng,Development of a customer satisfaction evaluation model for construction project management,Building and Environment, 43, No. 4,pp. 458-468,2008
- 呂文授、楊智斌,營建專案管理經理人應具備人格特質之分析,營建管理季刊,第74期,第35-43頁,2008
- 廖碧雲、楊智斌,汙水下水道管線工程成本結構分析,營建管理季刊,第73期,第68-77頁,2007
- Jyh-Bin Yang,Developing a knowledge map for construction scheduling using a novel approach,Automation in Construction, 16, No. 6,pp. 806-815,2007
- Jyh-Bin Yang, Chih-Tes Wu and Chiang-Huai Tsai,Selection of an ERP System for a construction firm in Taiwan: a case study,Automation in Construction, 16, No. 6,pp. 787-796,2007
- Chun-Chang Lin, Wei-Chih Wang* and Jyh-Bin Yang,Evaluating bid item prices to support contractor selection – a case study,Journal of the Chinese Institute of Engineers, 30, No.4,pp. 765-771,2007
- Ming-Kuan Tsai, Jyh-Bin Yang and Chang-Yu Lin,Synchronization-based model for improving on-site data collection performance,Automation in Construction, 16, No. 3,pp. 323-335,2007
- Ming-Kuan Tsai, Jyh-Bin Yang and Chang-Yu Lin,Integrating wireless and speech technologies for synchronous on-site data collection,Automation in Construction, 16, No. 3,pp. 378-391,2007
- Jyh-Bin Yang,How the critical chain scheduling method working for construction,Cost Engineering, 40, No. 4,pp. 25-32,2007
- 楊智斌,專案管理實務案例:咖啡專賣連鎖店行銷專案,台灣專案管理雜誌,創刊號,第40-46頁,2007
- 楊智斌、尹碧娟,國外工程時程延遲分析技術之比較(下),營建知訊,第283期,第49-59頁,2006
- 楊智斌、黃榮堯,國內營建管理教育對國際專案管理證照發展因應之道,土木水利,第33卷第4期,第40-49頁,2006
- 楊智斌、鄧雅玲,營建管理碩士論文引用文獻分析,營建管理季刊,第67期,第41-51頁,2006
- 楊智斌、尹碧娟,國外工程時程延遲分析技術之比較(上),營建知訊,第281期,第59-64頁,2006
- 楊智斌、魏沛銳,工程規劃設計階段時程延遲原因調查分析,中華建築技術學刊,第2卷第2期,第53-60頁,2005
- 楊智斌、黃賢炳,專案管理廠商服務成本調查分析,營建管理季刊,第65期,第1-5頁,2005
- Wei-Chih Wang and Jyh-Bin Yang,Applications of electronically facilitated bidding model to preventing construction disputes,Automation in Construction, 14, No. 5, pp. 599-610,2005
- 楊智斌、葉坤源,案例式專案管理廠商資格條件知識庫系統之建立,技術學刊,第20卷第3期,第231-240頁,2005
- 余文德、楊智斌,公路工程工期與成本關係之探討,中國土木水利工程學刊,第17卷第3期,第559-566頁,2005
- 楊智斌、歐昇芬,工程施工階段時程延遲原因調查分析,中華建築技術學刊,第2卷第1期,第45-54頁,2005
- 楊智斌、吳坤鴻,時程分析技術知識地圖之建置,營建管理季刊,第63期,第29-38頁,2005
- 尹碧娟、楊智斌,營建業赴中國公司內部生產管理機制探討,現代營建,第301期,第51-56頁,2005
- 楊智斌、高志魁,關鍵鏈排程與資源限制排程之差異分析,中華建築技術學刊,第1卷第1期,第67-76頁,2004
- 余文德、楊智斌,鋼筋混凝土公路橋梁工程成本概估系統,亞太工程科技學報,第2卷第2期,第85-102頁,2004
- 陳曄、楊智斌,國內承包商簽訂國際性工程契約應注意事項分析,營建管理季刊,第59期,第51-54頁,2004
- 卓利彥、楊智斌,國內建築模版工程採用新工法之問題分析,現代營建,第293期,第31-35頁,2004
- 陳曄、楊智斌,建築設施維護管理模式與資訊化之探討,營建知訊,第255期,第35-45頁,2004
- 楊智斌、高志魁,關鍵鏈排程法原理與應用,營建管理季刊,第58期,第46-53頁,2004
- Jyh-Bin Yang,A hybrid AI system for retaining wall selection problems,Construction Innovation, 4, No. 1,pp. 33-52,2004
- 余文德、楊智斌、賴建中、鄭正光,類神經模糊系統於工程成本概估及分析之應用—以鋼筋混凝土公路橋梁為例,土木水利,第31卷第1期,第74-77頁,2004
- 楊智斌、林鴻倫、陳瑩潔、彭聖麒、王慕舜,營建工程專案管理業主滿意度分析,現代營建,第290期,第63-69頁,2004
- 楊智斌、曾錦燦,大陸政府採購法位階屬行政法,營建知訊,第251期,第20-28頁,2003
- 吳秩策、蔡江淮、楊智斌,營造業電子化的關鍵因素,營造天下,第95-96期,第21-25頁,2003
- 余文德、楊智斌,e化課程對於營建工程教育之效益分析,技術學刊,第18卷,第4期,第451-459頁,2003
- Jyh-Bin Yang and Wei-Chih Wang,Contractor selection by the most advantageous tendering approach in Taiwan,Journal of the Chinese Institute of Engineers, 26, No. 3,pp. 381-387,2003
- 楊智斌、陳威銘,運用共同排程資訊即時化,營建知訊,第244期,第41-49頁,2003
- 楊智斌、陳威銘,傳統排程與共同排程之比較分析,土木工程技術,第7卷第1期,第33-46頁,2003
- 楊智斌,案例式推理技術在營建產業應用之探討,現代營建,第277期,第45-54頁,2003
- 楊智斌、李雨澤,高科技廠商建廠過程業主端之時程控管現況分析,現代營建,第276期,第51-57頁,2002
- 楊智斌、林涵文、彭皓銑,國內甲級營造廠使用營建管理軟體之現況調查,現代營建,第275期,第75-81頁,2002
- Jyh-Bin Yang,A rule induction-based knowledge system for retaining wall selection,Expert Systems with Applications, 23, No. 3,pp. 273-279,2002
- 楊智斌、陳威銘、葉坤源,營建工程專案排程軟體功能分析與比較,營建管理季刊,第51期,第23-32頁,2002
- 姚乃嘉、楊智斌、郭文達,投標決策因素之分析與應用,建築學報,第36期,第21-37頁,2001
- 楊智斌、姚乃嘉,法則歸納法應用自動化之整合型模式,中國土木水利工程學刊,第12卷第1期,第179-186頁,2000
- Jyh-Bin Yang and Nie-Jia Yau,Integrating case-based reasoning and expert system techniques for solving experience-oriented problems,Journal of the Chinese Institute of Engineers,, 23, No. 1,pp. 83-95,2000
- Nie-Jia Yau, Jyh-Bin Yang, and Ting-Ya Hsieh,Inducing rules for selecting retaining wall systems,Construction Management and Economics, 17, No. 1,pp. 91-98,1999
- 楊智斌、姚乃嘉,公部門採行專業營建管理制度實施重點之探討,營建管理季刊,第37期,第23-32頁,1998
- 姚乃嘉、楊智斌、郭文達,營造公司工程現金流量之預測模式,中國土木水利工程學刊,第10卷第3期,第397-405頁,1998
- 姚乃嘉、楊智斌、郭文達,營造公司工程現金流量之預測模式,中國土木水利工程學刊,第10卷第3期,第397-405頁,1998
- Nie-Jia Yau and Jyh-Bin Yang,Applying CBR Technique to Retaining Wall Selection,Automation in Construction, 7, No. 4,pp. 271-283,1998
- Nie-Jia Yau and Jyh-Bin Yang,Case-Based Reasoning in Construction Management,Microcomputers in Civil Engineering: Journal of Co, 13, No. 2, pp. 143-150,1998
- 姚乃嘉、楊智斌,工程投標前之成本分析,營建管理季刊,第23期,第46-58頁,1995
- 姚乃嘉、楊智斌,專家系統在營建管理上之應用,營建管理季刊,第21期,第39-48頁,1994